Establish IICRC S-520 Standard Evaluation
The initial evaluation is the most important step in developing a safe & effective mold remediation.
Cover, Protect & Remove
Covering your floor and belongings will keep them safe. Valuables such as paintings and rugs are removed.
Containment Barriers
Containment barriers are put in place to avoid cross contamination of unaffected areas.
Ventilate & Negative Air
HEPA-filtered air devices keep the air quality safe and clean during remediation.
Demolition & Removal
Contaminated building materials are surgically removed, double bagged, sealed and disposed of.
HVAC Cleaning & Restoration
Air ducts and vents are cleaned, sanitized and restored to remove dust and microbial growth.
HEPA Vacuum
HEPA vacuums are used to remove surface mold spores to prevent airborne cross-contamination.
Apply Oxidizing Agent
An antimicrobial agent is applied to destroy surface mold and penetrate the substrate.
Neutralization & Oxidation
A concentrated hydrogen peroxide agent is applied to remove embedded roots and minimize staining.
Extraction & Wipe Clean
All surface mold is vacuumed, wiped and cleaned off affected materials.
Dry & Dehumidify
Moisture content is removed to maintain a safe relative humidity while the AC is OFF.
Air Filtration & Oxidation Plasma
HEPA air filtration and Active Ionic Oxidation Plasma deactivate mold and VOCs.
Final Vacuum & Disinfection
RE-HEPA Vacuuming and EPA-registered fungicide application are performed after cleaning.
Mold-Proof Coating
A clear or white mold resistant coating is applied to prevent reoccurrence.
Confirm Cleanup
Sani Effect performs post remediation inspection and testing to verify success.
Recurrent Mold Prevention
Continuous Sanitizing & Humidity Management System to maximize property values.